The guide

The whole renovation, at one glance.

Twelve steps, from first enquiry to move-in. About a month if you’re ready to build; nearer five if you want time to plan first. The first consultation is complimentary.

Planningat your pace
  1. 01

    Enquiry

    Flat type, estate, key collection date and budget.

  2. 02

    Initial response

    An indicative figure and clarifying questions, within one working day.

  3. 03

    Consultation

    At your flat or our studio, complimentary.

  4. 04

    Concept drawings

    Layout options and design direction for review.

  5. 05

    Itemised quotation

    Every trade priced on its own line.

  6. 06

    Your decision

    No obligation; work begins only on confirmation.

The build4–8 weeks
  1. 07

    Material selection

    Flooring, wall finishes, lighting and hardware confirmed.

  2. 08

    Contract & permits

    Deposit, contract signing, HDB or condominium approvals.

  3. 09

    Demolition & wet works

    Hacking, masonry, plumbing and waterproofing.

  4. 10

    Carpentry & finishing

    Built-ins installed; tiling, painting and lighting completed.

  5. 11

    Inspection & rectification

    Two joint walk-throughs; defects resolved before handover.

Afterhandover
  1. 12

    Handover & warranty

    Keys handed over, backed by a twelve-month workmanship warranty.

Worth knowing
  • Quotations are revised only when the scope changes, and every revision is shown before work proceeds.
  • Certain materials carry lead times of several weeks; these are factored into the schedule.
  • Some weeks show little visible progress while waterproofing and curing complete.
  • Mid-project revisions to finishes are common and accommodated.
  • Final detailing and rectification typically take the longest.