The whole renovation, at one glance.
Twelve steps, from first enquiry to move-in. About a month if you’re ready to build; nearer five if you want time to plan first. The first consultation is complimentary.
- 01
Enquiry
Flat type, estate, key collection date and budget.
- 02
Initial response
An indicative figure and clarifying questions, within one working day.
- 03
Consultation
At your flat or our studio, complimentary.
- 04
Concept drawings
Layout options and design direction for review.
- 05
Itemised quotation
Every trade priced on its own line.
- 06
Your decision
No obligation; work begins only on confirmation.
- 07
Material selection
Flooring, wall finishes, lighting and hardware confirmed.
- 08
Contract & permits
Deposit, contract signing, HDB or condominium approvals.
- 09
Demolition & wet works
Hacking, masonry, plumbing and waterproofing.
- 10
Carpentry & finishing
Built-ins installed; tiling, painting and lighting completed.
- 11
Inspection & rectification
Two joint walk-throughs; defects resolved before handover.
- 12
Handover & warranty
Keys handed over, backed by a twelve-month workmanship warranty.
- Quotations are revised only when the scope changes, and every revision is shown before work proceeds.
- Certain materials carry lead times of several weeks; these are factored into the schedule.
- Some weeks show little visible progress while waterproofing and curing complete.
- Mid-project revisions to finishes are common and accommodated.
- Final detailing and rectification typically take the longest.